

No activity of any kind was observed from SCP-914 during this time.

D-00104 was dispatched to SCP-914, and instructed to turn the key and activate SCP-914.ĭ-00104 reported that "the key won't catch", and the key was observed to turn several times without tightening the mainspring. Testing area was cleared and sealed after placing a steel block in the "intake" booth. Placement was carefully documented, and was in a location that would not release tension on any belts or damage any documented sections. With approval from O5 Command, a single gear was removed from one of the "outer" sections of SCP-914. Test 11828-U5: Tests on the nature and construction of SCP-914
